Moving a 120-ton turbine across three borders

Moving a 120-ton turbine across three borders

An oversized wind turbine delivered on schedule, with zero safety incidents.

Client:

Halden Energy

Industry:

Renewable Infrastructure

Cargo Type:

Oversized turbine assembly (120t)

Timeline:

11 days, escorted

Technician checking the hydraulics of a heavy-haul trailer
Technician checking the hydraulics of a heavy-haul trailer

Challenge

An oversized wind turbine assembly needed specialized transport, detailed road surveys, and permits across three jurisdictions. A single misstep could have halted the whole convoy for days.

An oversized wind turbine assembly needed specialized transport, detailed road surveys, and permits across three jurisdictions. A single misstep could have halted the whole convoy for days.

120t

Single-piece cargo moved

-15%

Vs. original estimate

Heavy-haul convoy moving a turbine section along an empty highway

Solution

We engineered a multimodal route using modular trailers, ran escorted night convoys to avoid traffic restrictions, and centralized every permit through a single management desk in Hamburg.

Efficient operations

Transparent process

Adaptive logistics

Client Testimonial

“Complex, oversized, cross-border, and it still arrived exactly when they said it would. Every permit, escort, and night move was planned to the hour, and the site crew never waited once.”
“Complex, oversized, cross-border, and it still arrived exactly when they said it would. Every permit, escort, and night move was planned to the hour, and the site crew never waited once.”
Portrait of Jonas Weber
Portrait of Jonas Weber

Halden Energy

Renewable Infrastructure

More Cases

Wind turbine blade on a multi-axle heavy-haul trailer

Project Cargo

Destination:

Wind farm site, Poland

Origin:

Hamburg Port, DE

Moving a 120-ton turbine across three borders